Free Republic
Browse · Search
General/Chat
Topics · Post Article

To: Monrose72

You have engineering corps that are trained in construction.

But I’m thinking what’s required?
You dig a ditch.
You place the steel, with supports leveling it.
You pour concrete.
The border is 1900 miles long.

So you set up 40 teams, one team for each 50 miles.
Give each team 10 trenchers and 4 cranes.
Arrange for the steel to be delivered (Probably the bottleneck).
Arrange for the concrete to be delivered.
Set up a system, so the ditch is dug in time for the steel to be delivered and placed, and the concrete comes shortly thereafter.


12 posted on 01/08/2019 8:39:56 AM PST by DannyTN
[ Post Reply | Private Reply | To 4 | View Replies ]


To: DannyTN

Send in the Romans...


49 posted on 01/08/2019 9:51:28 AM PST by karnage
[ Post Reply | Private Reply | To 12 | View Replies ]

To: DannyTN

The Bees will build concrete plants along the way. It won’t have to be delivered.


57 posted on 01/08/2019 11:48:46 AM PST by Terry Mross (I)
[ Post Reply | Private Reply | To 12 | View Replies ]

To: DannyTN

Actually using steel - you just pound the steel sections into the ground to whatever depth is set - this sort of steel construction goes very fast and is relatively cheep. No concrete needed.


60 posted on 01/08/2019 1:35:21 PM PST by PIF (They came for me and mine ... now it is your turn ...)
[ Post Reply | Private Reply | To 12 | View Replies ]

Free Republic
Browse · Search
General/Chat
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson