Free Republic
Browse · Search
General/Chat
Topics · Post Article

To: gubamyster

Where in the SW, I’m wondering.


255 posted on 11/28/2018 8:56:59 AM PST by Lakeside Granny
[ Post Reply | Private Reply | To 242 | View Replies ]


To: Lakeside Granny

It looks like they haven’t decided yet:

Steel Dynamics to build new organic flat roll steel mill costing $1.7B-$1.8B

https://seekingalpha.com/news/3412256-steel-dynamics-build-new-organic-flat-roll-steel-mill-costing-1_7b-1_8b

FTA: Steel Dynamics (NASDAQ:STLD) announces plans to spend $1.7B-$1.8B on construction of a new electric arc furnace flat roll steel mill in the southwestern U.S. to serve the southern U.S. and the underserved Mexican flat roll steel market.

STLD expects the facility will have an annual production capacity of ~3M tons with the capability to produce the latest generation of advanced high strength steel products; the project will include value-added finishing lines, including a galvanizing line with an annual capacity of 450K, and a paint line with an annual coating capacity of 250K tons.

Upon final site selection and obtaining required environmental and operating permits, STLD expects to begin construction in 2020 with operations starting in H2 2021.


265 posted on 11/28/2018 9:01:43 AM PST by gubamyster
[ Post Reply | Private Reply | To 255 | View Replies ]

Free Republic
Browse · Search
General/Chat
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson