The Florida State enginee would have stayed it approved. He didn’t prepare the design or supervise it during the preparation. Only the lead engineer for the design company would have stamped and signed it. That is the requirement that the plans were prepared by a licensed PE.
I may have misread your post thinking you were saying that the State of Florida has a lead engineer that approves such plans. My apologies.