Yes, I see that now. I have to wonder about why they permitted vehicular traffic to flow under it in the “still under construction” state.
The most likely reason is so they could brag about how little downtime was required with their innovative bridge construction technique.
Its a pedestrian overpass for the college. They installed it Saturday. My guess the set it down to hard and cracked a beam. The roadway vibration just set it off.