But when the gas is introduced, there may be a leak and subsequent fire.
******************
Would not the pipeline sections be pressure tested prior to intoducing product?
I don’t know but would think they would be tested.
Yes it sure would be pressurized to design pressure and observed how long it could maintain that pressure. My bad.