Free Republic
Browse · Search
General/Chat
Topics · Post Article

To: Noob1999

Allam cycle gas turbine system of 350 MW will have a 2-3 hour start-up from cold. Electrical turn-down is 100% without a drastic loss of efficiency, yet still off loads CO2 produced from hot stand-by operation to a pipeline. Will load follow with a ramp of 3-5% per minute.


72 posted on 01/22/2017 8:01:10 PM PST by Ozark Tom
[ Post Reply | Private Reply | To 44 | View Replies ]


To: Ozark Tom

Thank you. I did not know current technology.

Yet, isn’t it true that a non producing backup power source will take up to a few hours to come online after a wind calm, or a storm, reduces alt energy, so the turbine needs to be running on standby all the time to prepare for the immediate energy needs?


74 posted on 01/22/2017 9:00:51 PM PST by Noob1999
[ Post Reply | Private Reply | To 72 | View Replies ]

Free Republic
Browse · Search
General/Chat
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson