I'm headed down with the structural engineers and the master carpenter to do a more thorough inspection.
For now, the bar is sound, so let's just keep everyone there for the time being.
I'm figuring that since we're moving at a decent pace, the mechanical stuff's working. Though I haven't checked it out.
BTW-There's a mess in the cooler, what we have in the bar is it, and Room 101 has to be straightened up (else, the Nice Men can't work) ;).