IF, I have my facts right...
Biden offered up $6.6 billion U S dollars in grants to entice TSMC to build in AZ.
Three chip plants, costing $65 billion U S dollars, are currently underway north of Phoenix, near Interstate 17 and Loop 303.
Another three chip plants will be built in AZ under the Trump administration, with TSMC pledging to spend an additional 100 billion U S dollars.
I believe that I heard the TSMC CEO, mention in the just finished White House announcement that there will be two additional plants built to package the chips, for a total of 8 plants constructed at the AZ complex.
The plans are for all of the future chip plants across America to strategically construct their power-generating units on-site.
Last Energy has perfected microreactors that may be used as one type of solution to energy production on-site.
It is predicted that the explosion in AI will double the power needed by the U.S.
“ IF, I have my facts right...
Biden offered up $6.6 billion U S dollars in grants to entice TSMC to build in AZ.”
Your facts are 100% wrong.
I didn’t read anything after that.
Trump administration made the deal with TMSC to build in Arizona during his first administration.