Then explain how a plumbing business can drill all the holes and fight the electricians for them, redrill, run all the water, drains, gas, rough in toilets and sinks and tubs, water heater, outdoor hose bibbs and showers with skilled labor passing all inspections, and do top out for $600 total labor?
That $600 being total contract, including company profit.