If I remember correctly, the Cray-1 took about 15 tons of air conditioning to keep it cool. Sandía Laboratorios had several of them back in the day.
That would mean it was drawing around 50 kW worth of power.
IIRC, that’s in the range of what a big IBM 360 c. 1985 used as well.
ping