We have no timeline, just anxious for rebuild to start.

Things roll along very slowly, have to have patience.

They need to get a move on it as winter is coming and we don’t need frozen pipes as 1/3 of the insulation under home has been removed and needs replacement now.

We’d like the water heater closet fixed 1st and a new water heater installed but more flooring needs removed and rebuilt.

But the insulation is a must and don’t even know if it can be replaced until more flooring removed.

The contractor didn’t even know about having to take out more floor, hadn’t read the report that the demo guys put out, hmmmmm?

You’d of thunk that would be important in getting a proper estimate of the cost.

We went with this contractor because of the family connection with the demo company and were told they work closely together.


8,978 posted on 09/30/2023 7:09:20 AM PDT by Lakeside Granny (IN GOD WE TRUST with TRUMP WE STAND)
[ Post Reply | Private Reply | To 8973 | View Replies ]


To: Lakeside Granny

Wow.

Mike Lindell’s employees now being targeted for audits. Evil.


8,980 posted on 09/30/2023 7:19:44 AM PDT by JudyinCanada (America's enemies want you to "trust the plan." Fight in reality, not the rabbit holes.)
[ Post Reply | Private Reply | To 8978 | View Replies ]

Free Republic
Browse · Search
General/Chat
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson