Keystone wasn’t canceled. Oil still flows thru 4 phases of the pipeline.
what Joe Biden canceled was the XL branch of Keystone.
It wasn’t functional.
It was in the process of being built.
https://www.reuters.com/article/uk-factcheck-buffett-keystone-pipeline-idUSKBN2A22LR
thanks, but ya know there sure is a lot of oil going by train, for sure in my state in the PNW.