Nobody cares but I’m posting this in the hopes people get insight into one of days getting our second home in NH ready.
Agenda for tomorrow: 1. Mount indoor heat/AC unit bracket. 2. Cut hole in wall sloping downward by 0.25 inches. 3. Bends copper lines to go through said hole and insert wall sleeve. 4. Mount indoor indoor heat/AC unit. 5. Run power/comm line from indoor unit to the outside condenser unit. 6. Hook up 220 line from the panel to the outdoor breaker box. 7. Make the wire whip. 8. Run wire whip from the outdoor breaker box to the outside condenser unit. Electric done! 9. Hook up gas lines between the inside and outside units. 10. Blast nitrogen through the lines to eliminate air and contaminants from the lines and re-hook up the lines. 11. Turn on the power and power up the unit with the remote. 12. Do the testing in the directions. 13. Install wi-fi dongle so I can control it from anywhere on the planet. 14. Install app on my phone and test.
Get ‘r done.
-SB
Thanks, SB. I care, I’ve been following your progress. I wondered why you didn’t just tear it down and start from scratch. But that would be daunting, I realize that.
I wonder about the electricity. My little house is powered by, I think, a long extension cord from the panel (outside, I dug the holes and mounted the pole myself!). But, son ran the electric under the house for the water heater. I don’t know what he ran. I’m almost afraid to ask him! so, see, I am interested! Thanks for sharing!
I think people care a lot about your project! We’z just jealous cuz some of us are stuck.
Regarding #13 though.......