Container line reliability to take 8 – 9 months to recover

https://www.seatrade-maritime.com/containers/container-line-reliability-take-8-9-months-recover

Excerpt:

Overall container line schedule reliability dropped to 35.8% in 2021, according to analysts Sea-Intelligence. however, the picture was considerably worse on the main east-west trades, with niche trades bolstering the overall reliability percentage.

In attempt to see how long it would take schedule reliability to return to normal Sea-Intel drew a comparison with the labour dispute at US West Coast ports in early 2015 which led to severe disruption.

.....“Compared to a pre-pandemic baseline of 2017-2019, the excess delay in December 2021 versus the pre-pandemic baseline was 11.54 days, versus 8.73 days in February 2015 compared to the pre-labour dispute baseline. As the 2015 problem was resolved in 6-7 months, this means an average reduction in excess delay of 1.25-1.46 days per month,” said Alan Murphy CEO of Sea-Intel.

“If the current port and hinterland system manages the same speed of recovery this time, the delays also suggest that resolution would take 8-9 months,” he added.

The bad news is though there is no sign that the industry has started on this path of recovery as yet.
****


1,950 posted on 02/27/2022 6:38:06 PM PST by Sobieski at Kahlenberg Mtn. (All along the watchtower fortune favors the bold.)
[ Post Reply | Private Reply | To 1943 | View Replies ]


To: Sobieski at Kahlenberg Mtn.

+++!!


1,970 posted on 02/27/2022 7:16:50 PM PST by bitt ( <img src=' 'width=50%>)
[ Post Reply | Private Reply | To 1950 | View Replies ]

Free Republic
Browse · Search
General/Chat
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson