Free Republic
Browse · Search
General/Chat
Topics · Post Article

To: mbrfl

Interesting. ACoE speaker said the last 133 miles of wall are still in design stage. That means it’s a different design from the current one, which means it’s a unique area that’s probably never been done before. I’d love to know where that area is.

-SB


259 posted on 08/18/2020 11:12:41 PM PDT by Snowybear
[ Post Reply | Private Reply | To 256 | View Replies ]


To: Snowybear
ACoE speaker

?

Core of Engineers?

260 posted on 08/18/2020 11:16:36 PM PDT by M. Thatcher
[ Post Reply | Private Reply | To 259 | View Replies ]

To: Snowybear

I think that’s the part that includes the moat & sharks with laser beams or something lol


262 posted on 08/18/2020 11:20:20 PM PDT by Steven W.
[ Post Reply | Private Reply | To 259 | View Replies ]

To: Snowybear

I hadn’t thought of that. You’re probably right. It sounds like there’s something unique about those last 133 miles. Maybe they’re going to be in mountainous areas or some other unusual terrain.


265 posted on 08/18/2020 11:33:36 PM PDT by mbrfl
[ Post Reply | Private Reply | To 259 | View Replies ]

Free Republic
Browse · Search
General/Chat
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson