Portion of US BORDER WALL in California Fall Over in High Winds and Lands on Mexican Side
Note to builders- Better leave some bracing on while the concrete cures. (Chalk it up as a live and learn / build and learn lesson.)
I’ve poured a lot of concrete and built a lot of forms in my day. “The wall” is one hell of a “wind sail” which equates into tremendous pressure. Concrete is dynamic.
Let’s go!
Never mind the mule, load the wagon!
BUILD THAT WALL!
The cement wasn’t dry yet.