Free Republic
Browse · Search
General/Chat
Topics · Post Article

To: Axenolith

No, the bridge was still under construction.

They were doing some kind of stress test at the anchor points (where the cables would be attached—it is a cable stayed bridge when finished)

The crane lifted the bridge at one of the anchor points.

The latest is that the anchor point fractured, and the bridge dropped, cracking and collapsing it.

Why they would be doing any kind of live testing with traffic underneath is not known now.

The bridge section was constructed parallel to the roadway, then moved around 90 degrees and lifted into place last weekend.


873 posted on 03/15/2018 5:09:01 PM PDT by exit82 (The opposition has already been Trumped!)
[ Post Reply | Private Reply | To 864 | View Replies ]


To: exit82

Why do you suppose the MD Fire Chief called this a “National” tragedy?


894 posted on 03/15/2018 5:33:28 PM PDT by Jane Long (Praise God, from whom ALL blessings flow.)
[ Post Reply | Private Reply | To 873 | View Replies ]

Free Republic
Browse · Search
General/Chat
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson