Some slave is going to be in big trouble.
That’s what I was thinking. Subcontractor: “look, we leave a room here, that’s 100 tons less rock to move, and we hit the beach 6 weeks sooner....” I’ll bet it isn’t some grand design or alien link. Probably an oversight or intentional laziness.