To: Broker
PVC pipe spool storage area. Homeless campground. No reported cause of combustion yet known. Fracture critical structure. Single element risk. As per WSB Other immediate bridge sections at RISK
79 posted on
03/30/2017 5:21:59 PM PDT by
Broker
(EQUAL JUSTICE FOR ALL.)
To: Broker
Thanks. Homeless campground and a substantial fuel source.
81 posted on
03/30/2017 5:24:59 PM PDT by
PA Engineer
(Liberate America from the Occupation Media.)
To: Broker; eaglegso
This made me think of those 9/11 deniers that say the WTC could not have been taken down by two jet airliners.
Here we have an interstate span felled by burning PVC pipe.
83 posted on
03/30/2017 5:29:27 PM PDT by
higgmeister
( In the Shadow of The Big Chicken! - Si vis pacem, para bellum)
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson