you’re remodeling? we did that in September, 3 weeks without a kitchen was a little rough. i love my new one though.
Yeah, ripped out everything to the studs, all new electrical, plumbing and heating. We were doing wiring until midnight last night.
I’ve always done these projects all myself, but I have a laid off neighbor kid doing grunt work and my daughters boyfriend is an electrician, both basically work for grinders and beer, so it’s been a huge help.
I’ll be a hell of a lot longer than 3 weeks! I hope to have the walls up floor in before Christmas.