To: JRandomFreeper
I have looked at them, but was wandering how they handle load balance in a split phase panel?
At the moment I have built a separate pass through box with donut coils to monitor each side of the load and will balance it the best I can. The primary purpose is the well where nominal load is 1.92KW and surge (measured) 8.4KW and rated for 10. Water wells are a pain in the backside.
My old inverters will be headed into Faraday storage.
87 posted on
12/06/2012 10:57:24 PM PST by
PA Engineer
(Liberate America from the Occupation Media.)
To: PA Engineer
I had zero problems with stacking and splitting using the Outback equipment.
Read the specs.
Wells are a problem. I ran the genset when I had an electric pump, or hauled water when I didn't. I wasn't doing running water, then.
I really, really like where modern tech has gotten us.
/johnny
To: PA Engineer
My old inverters will be headed into Faraday storage. You have probably thought of this, but it might be a good idea to toss a couple of relatively cheap VOMs in there, too.
104 posted on
12/07/2012 5:14:30 AM PST by
Smokin' Joe
(How often God must weep at humans' folly. Stand fast. God knows what He is doing)
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson