Since 1999 the launch system has experienced the following potential disastrous occurrences:
July 1999 - Space Shuttle Columbia delayed by hydrogen leak.
December 1999 - Space Shuttle Discovery was grounded with damaged wiring, contaminated engine, dented fuel line, and paper work errors.
January 2000 - Space Shuttle Endeavor is delayed because of wiring and computer failures.
March 2000 - Space Shuttle Atlantis main engine must be replaced because of paperwork errors.
August 2000 - Inspection of Space Shuttle Columbia reveals 3,500 defects in wiring. Wiring defects plague entire fleet.
October 2000 - The 100th flight of the space shuttle was delayed because of a misplaced safety pin and concerns with the external tank.
April 2001 - NASA failed to keep adequate watch on safety operations of a major contractor.
July 2002 - The inspector general reports that space shuttle safety program not properly managed.
April 2002 - Hydrogen leak forces scrub of the Atlantis flight.
August 2002 - Shuttle launch system grounded after fuel line cracks are discovered in all the fleet!
Dec. 12, 2002 another Shuttle propellant leak found!
120 posted on
02/03/2003 10:58:27 PM PST by
TLBSHOW
(God Speed as Angels trending upward dare to fly Tribute to the Risk Takers)
To: TLBSHOW
12 incidents in five years?
I've had more work done on my convertible than that!