Free Republic
Browse · Search
News/Activism
Topics · Post Article

To: Lancey Howard
Since 1999 the launch system has experienced the following potential disastrous occurrences:

July 1999 - Space Shuttle Columbia delayed by hydrogen leak.

December 1999 - Space Shuttle Discovery was grounded with damaged wiring, contaminated engine, dented fuel line, and paper work errors.

January 2000 - Space Shuttle Endeavor is delayed because of wiring and computer failures.

March 2000 - Space Shuttle Atlantis main engine must be replaced because of paperwork errors.

August 2000 - Inspection of Space Shuttle Columbia reveals 3,500 defects in wiring. Wiring defects plague entire fleet.

October 2000 - The 100th flight of the space shuttle was delayed because of a misplaced safety pin and concerns with the external tank.

April 2001 - NASA failed to keep adequate watch on safety operations of a major contractor.

July 2002 - The inspector general reports that space shuttle safety program not properly managed.

April 2002 - Hydrogen leak forces scrub of the Atlantis flight.

August 2002 - Shuttle launch system grounded after fuel line cracks are discovered in all the fleet!

Dec. 12, 2002 another Shuttle propellant leak found!

120 posted on 02/03/2003 10:58:27 PM PST by TLBSHOW (God Speed as Angels trending upward dare to fly Tribute to the Risk Takers)
[ Post Reply | Private Reply | To 78 | View Replies ]


To: TLBSHOW
12 incidents in five years?

I've had more work done on my convertible than that!

129 posted on 02/03/2003 11:03:54 PM PST by Howlin
[ Post Reply | Private Reply | To 120 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson