Free Republic
Browse · Search
News/Activism
Topics · Post Article

To: ProtectOurFreedom

My dad is a civil engineer for 40+ years and had a few of his pretension concrete structures fail over the years.

The designers will always blame loading that wasn’t part of the design requirements, like twisting or “shock loads” during construction...because that never happens, you know.

The support cables don’t appear cosmetic. It is my guess that whoever told them to pull the supports out will be held criminally liable, unless it is a minority or a woman.


522 posted on 03/15/2018 6:43:32 PM PDT by UNGN (I've been here since '98 but had nothing to say until now)
[ Post Reply | Private Reply | To 516 | View Replies ]


To: UNGN

But they couldn’t have left that vehicle / jacking system in place for the next year while the bridge was completed. That would have blocked the road for an entire year. I’m guessing that the truss was designed to be self-supporting for its dead load and the tower / stayed cables would have added load capacity to support the live load.


532 posted on 03/15/2018 7:22:56 PM PDT by ProtectOurFreedom
[ Post Reply | Private Reply | To 522 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson