To: gandalftb

You give some excellent info on the tracks that you are familiar with here, but there are a few details that you are mistaken on.

First, Sound Transit “purchased” the track that makes up the “bypass” from the mainline and they spent over $800 million dollars improving them. Second the Amtrak train that crashed weighed considerably more than a million pounds. The passengers and their luggage weighed less than 18,000 pounds so the train in this case was essentially not any heavier loaded than unloaded.

The “bypass” route was suppose to save the 70 or so passengers who typically are found on this run 4 minutes as compared to the mainline. In test runs it was found that the actual time is slower than the mainline. How the government can spend nearly a billion dollars on track improvements to save around 70 people 4 minutes a few times a day is sort of incredible.

Supposedly there are a few other benefits to the nearly Billion dollars in taxpayer money spent, but no one at Sound Transit seems to be able to articulate them very well so I cannot tell you what they are.

It will most likely be found in the upcoming investigation, that the engineers were being pressured to travel the $800 million dollar bypass section on the route in a shorter time than it takes to takes to run the mainline. Unfortunately, running through the densely populated areas in Tacoma and Lakewood at 80 mph truly is not safe so the train really needed to be pushed when it got into the less populated Tillicum / Ft. Lewis / Dupont area. The pressured engineer was most likely keeping an eye on the clock and not the speed signs and screwed up.

I hope that the whole rotten bunch goes down and not just the engineer. People were put at risk to try and help upper management save face. The taxpayers, the City of Tacoma and the City of Lakewood were all lied to by Sound Transit about the benefits of this project to push it through. The mayor of Lakewood spoke out about the dangers, but was ignored.


132 posted on 12/19/2017 9:02:07 AM PST by fireman15
[ Post Reply | Private Reply | To 49 | View Replies ]


To: fireman15

I was not really mistaken.

Tacoma Rail has trackage rights over Sound Transit Line between Dupont and South Tacoma, (walks like a duck, etc.). Technically we’re both right, does it matter to FR?

I did not say that weight was the cause of the crash. My point was that heavy trains should have been used to establish the correct track speed. In fact the maximum track speed was well established.

Agreed, this bypass has questionable benefit for passenger transport. However, there is a significant benefit to the Port of Tacoma and Ft. Lewis, but they hardly need 80 mph trains.

I am very familiar with the track route, and particularly in Tillicum they have to keep the track speeds down, big safety issue.


155 posted on 12/19/2017 10:18:53 AM PST by gandalftb
[ Post Reply | Private Reply | To 132 | View Replies ]