The video says nothing and no update is given. Par for the course for a California union controlled agency.
It has beautiful Muzac music.
Gets me all warm and fuzzy.
Actually it looks to me that they have removed the old spillway structure which was elevated, and are replacing it with surface level concrete spillway.
I’ll leave it to a engineer to confirm this and advise if this is the best course or not.