“weakness” evident of 5% of the design flow. Usually with good design margins, things will work at 1.5X to 2X of rated capacity. Here we have potential failure at 5% of rated capacity. That is very odd.
It’s wonderful that we are building a useless high-speed choo-choo and ignoring our basic water infrastructure. State heads better roll over this (starting with moonbeam) even if the situation gets no worse.
Water going through cracks in the soft limestone???