Free Republic
Browse · Search
News/Activism
Topics · Post Article

To: EarthResearcher333
Construction photos of the building of the "Cutoff Wall". Removable forms are being used to create concrete side structures. The wall will be cut deeper within this zone to get to competent rock. Apparently, this location, 700 feet down from the ES Weir, had closer to the surface rock to facilitate a shorter wall height.




3,889 posted on 06/25/2017 1:42:53 AM PDT by EarthResearcher333
[ Post Reply | Private Reply | To 3888 | View Replies ]


To: EarthResearcher333

File for reference

http://www.water.ca.gov/news/newsreleases/2017/041717_oro_contract_award.pdf

April 17, 2017
DWR Awards Contract for Oroville Spillways Repair
SACRAMENTO

Details of the three bids will not be made public, as they contain design information that is considered Critical Energy/Electric Infrastructure Information by federal regulators and could cause a security risk if released.


3,890 posted on 06/25/2017 5:53:07 AM PDT by abb ("News reporting is too important to be left to the journalists." Walter Abbott (1950 -))
[ Post Reply | Private Reply | To 3889 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson