A10
P3C
B51
Just 3 AC that will work today as they did in the past, will work in the future as well
P-8 trying to replace the P-3 is another massive failure and a very costly one. Taking over the P-3 mission from high altitude required changing everything the P-3C could do quicker, cheaper and for longer periods of time. Then there’s the infrastructure for the P-8, new hangars, ramps spaces had to be redone for the weight all new GSE and the cost just continues to pile up.