It's sometimes dirty, un-airconditioned, with awful hours, and every holiday is a mandatory work day to do down time maintenance and projects.
The last guy we hired is remembered by the two foot prints left on the concrete floor where he was standing when he ran a metal fish tape pulling wires and happened across two legs of live 2300 Volts.
21 posted on 07/03/2015 11:53:55 PM PDT by blackdog
(There is no such thing as healing, only a balance between destructive and constructive forces.)