Free Republic
Browse · Search
News/Activism
Topics · Post Article

To: Razzz42

The ignorance on this thread is incredible.

1. SONGS-2 and SONGS-3 have different issues. Review the NRC website for details.

2. MHI (Mitsubishi Heavy Industries) is paying for all repairs / engineering / mitigation. The steam generators are well within their warranty period. If replacement steam generators are called for, MHI will pay for them. This won’t cost rate payers a cent.


25 posted on 03/28/2012 6:44:11 AM PDT by kidd
[ Post Reply | Private Reply | To 23 | View Replies ]


To: kidd

Learn how to comprehend what you are reading, you’re embarrassing...

Tests on massive steam generators at the troubled Unit 3 reactor at the San Onofre Nuclear Generating Station, which was shut down as a precaution after the leak on Jan. 31, revealed seven alloy tubes that carry radioactive water are in danger of rupturing under high pressure. Traces of radiation escaped during the January leak, but officials said there was no danger to workers or neighbors.

Unusual wear has been found on hundreds of similar tubes that carry radioactive water at its twin, Unit 2, which was shut down earlier this year for routine maintenance, leaving questions about the integrity of equipment the company installed at the two reactors in a multimillion-dollar makeover in 2009 and 2010.

A special team of federal investigators was dispatched to the seaside site, about 45 miles north of San Diego, on Thursday to focus on Unit 3. While gradual tube wear is common in steam generators over time, no one knows why so many state-of-the-art tubes in relatively new equipment have degraded so quickly.

There are nearly 20,000 steam generator tubes in each of the two reactors. After tests, the company said a total of 321 tubes will be plugged and taken out of service at the two reactors, well within the margin to allow them to continue to operate...

Did that Mitsubishi Heavy Industries contract include covering the costs of downtime and paying for backup power generation during repairs?

A guarantee like this could bankrupt a company. Looks like GE sold off parts of their nuke industry and got out when they saw the writing on the wall.


27 posted on 03/28/2012 10:04:56 AM PDT by Razzz42 (`)
[ Post Reply | Private Reply | To 25 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson