Free Republic
Browse · Search
News/Activism
Topics · Post Article

To: UCANSEE2
Someone had to monkey with the lights and track switches for this to happen.

Have to disagree. The engineer was stopped between signals and if he couldn't see the next signal he was required to proceed at "restricted speed" which in short is a speed that he could stop within one half the field of vision. If he entered the block on "color" which he undoubtedly did then he was required by rule to proceed at the restricted speed requirement. The engineer forgot where he was and what he was doing...easy but I would assume even easier to do while texting. Really doubt if anyone tampered with anything.

54 posted on 09/13/2008 8:21:47 PM PDT by engrpat
[ Post Reply | Private Reply | To 20 | View Replies ]


To: engrpat

Then tell me how a train either doesn’t get routed to the siding , or gets back on the main track, without the switches being changed.


86 posted on 09/14/2008 2:25:48 PM PDT by UCANSEE2 (The Last Boy Scout)
[ Post Reply | Private Reply | To 54 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson