Posted on 06/24/2008 5:27:28 AM PDT by thackney
U.S. Gulfs largest discovery producing after delays; just one well online; commissioning will be after steady state production
The BP-operated Thunder Horse field, the largest-ever oil discovery in the U.S. Gulf of Mexico, is finally onstream and headed toward higher production following repeated startup delays dating back to 2005. First oil was achieved June 14 from a single well, BP confirmed.
We have a lot yet to do as we prepare other wells for production and continue to drill and complete other wells, BP spokesman Ronnie Chappell told Petroleum News June 17.
The Thunder Horse platform, on a multitract development in the vicinity of Mississippi Canyon Block 822 in water depths of up to 6,050 feet, is capable of producing 250,000 barrels of oil per day and 200 million cubic feet of gas per day.
However, Thunder Horses actual production profile hinges on well performance and how fast we are able to drill and connect new wells, Chappell cautioned.
We are making good progress, he added. First oil is an important milestone on the way to startup of the Thunder Horse field. We will be ramping up production in the coming months.
Formal startup later
BP will announce the formal startup of Thunder Horse when field commissioning is finished and we achieve steady state operations, Chappell said. The Thunder Horse field was discovered in 1999, and was designed to use the largest production drilling semi-submersible platform in the world. The platform weighs more than 50,000 tons and will produce from some of the highest temperature and highest-pressure wells in the Gulf of Mexico.
Thunder Horse and its estimated 1 billion barrels of recoverable oil became the development centerpiece for a massive pipeline system serving Thunder Horse and other large BP discoveries in the deepwater U.S. Gulf, including Atlantis and Mad Dog.
However, Thunder Horse development has been plagued with problems over the years, causing not only startup delays for Thunder Horse, but also for Atlantis due to concerns over the integrity of subsea equipment.
BPs headaches began in 2003 when development drilling was temporarily suspended after a marine riser separated between a drilling rig and a production well about 6,000 feet below the ocean surface. The Transocean rig was drilling BPs ninth development well at Thunder Horse when the riser separated in what industry experts said was a rare occurrence.
Initial startup set for 05
Thunder Horse missed its initial 2005 startup when Hurricane Dennis swept through the U.S. Gulf, purportedly causing damage to the platform and causing it to list 20 to 30 degrees, according to BP. However, the U.S. Minerals Management Service all but dismissed Dennis and its high winds as the cause of the listing. Nevertheless, BP postponed Thunder Horse production into 2006.
Later BP told analysts in a conference call that leaks in the manifold system would delay first production from late 2006 into early 2007, but didnt specify the cause of the damage. The manifold, built by Houston-based FMC Technologies, is a massive subsea structure designed to send oil and gas from individual wells up toward the production platform. Reportedly, the structure could have been damaged during Hurricane Dennis.
One industry analyst theorized that the leaks might have come from hydrogen embrittlement of the welds, with the hydrogen coming from seawater that seeped in through cracks in the insulation. The insulation then may have been damaged as the manifolds, insulated in 2004, sat unused for an extended period on the sea floor.
Startup again was delayed when a series of tests revealed metallurgical failure in components of the fields subsea system. As a precaution, BP said it would retrieve and replace all the subsea components it believed could be at risk. The company said the work would be done over the next year but did not expect first production from Thunder Horse before the middle of 2008. Analysts believed the fix would add tens of millions of dollars to the project. The production facility alone cost more than $1 billion.
Just a week after announcing its final startup target for Thunder Horse, BP announced postponement of first production from Atlantis, from year-end 2006 to the first quarter of 2007. Because the Atlantis project was at an earlier stage of subsea installation than Thunder Horse, BP said it had already taken the opportunity to retrieve and make precautionary modifications to the Atlantis manifolds. Production was actually brought online in October 2007 from a facility designed to process 200,000 barrels of oil per day and 180 million cubic feet of gas per day.
BP owns 75 percent of Thunder Horse and ExxonMobil 25 percent, while BP owns 56 percent of Atlantis and Australias BHP Billiton owns 44 percent.
Yep, thanks.... Maybe we should see some more development in the gulf before dishing out more land. Like I said this equipment cannot be easy to come by.
That was not the gulf of Mexico, it was the Yucatan Peninsula, about 1000 miles South of there. And there is much building evidence that was just a farce. New geological discoveries are rapidly disproving that idea.
I have often remarked at the clumsiness exhibited by BP after their purchase of Amoco. they went cheap on pipe, maintenance and safety and have several fatalities as a result, not to mention a smaller retail structure. Why they destroyed the Amoco brand, a premium and well regarded name in marketing, is beyond me.
http://www.gomr.mms.gov/homepg/lsesale/mau_gom_pa.pdf
Not every acre contains oil and others don't have enough to be economic to go after. Thunder Horse wouldn't have been built to recover a couple thousand barrels.
If oil is composed of dead vegetation, etc., how did old leaves/rain forests get down to 6000’?
what stabilizes it, ie keeping it exactly in place? Is it tethered to the bottom?
It sounds like a good name for malt liquor.
I'll bet if Marxine Waters, Hinchey, and the Dems had managed to nationalize this operation 10 years ago, the US Government could have done it quicker and better. /s/
Just think how much better off the American consumer would be if BP's profits were confiscated rather than squandered on follies such as this.
This is probably one of the hardest drilling jobs we could have — and it took 9 years to get oil.
Most of the places we WANT to open to drilling would be a lot easier to drill. Obviously we can do it in less than 10 years.
>> Nope, just Florida and California........and maybe Oregon.......... <<
Yeah, there’s just so much oil off the coast of Tennessee. (/sarc) (Lurkers beware: Anyone who double checks his atlas gets sent to DU.)
“When running at full tilt, Thunder Horse alone will increase overall U.S. oil and natural gas production by 3.6 percent.”
If “full tilt” is 250,000 bpd, that means that current US production is around 7 million bpd? I didn't realize it was still that high.
Of course you know what the Democrats will say - it won't replace all our oil imports.
The thing is, I've seen estimates that ANWR, when running full tilt, might produce as much as a million bpd, that the Bakken could produce a couple million bpd. I imagine drilling off the east and west coast might add similar amounts (hundreds of thousands or more bpd). And it starts to add up.
To paraphrase Everett Dirksen, a million bpd here, a million bpd there, pretty soon, it adds up to real oil.
And a very significant percentage of our current imports.
sitetest
Multiply sedimentation rates of a few centimeters per thousand year times 400 million years or so.
This sedimentary rock started forming before the Gulf of Mexico even existed.
9 years after completion of the discovery well. It was years of preparation, seismic studies and the like before that first well.
cool
Oil and gas together. I think they use the energy of natural gas measured in equivalents of oil barrel for this type of comparison.
Current US crude oil production is about 5.1 MMBPD
US Crude Oil Production by State:
http://tonto.eia.doe.gov/dnav/pet/pet_crd_crpdn_adc_mbblpd_m.htm
Re #23....Most folks have no idea the expertise required by the engineers and riggers to accomplish that feat....not to mention the operation of keeping Thunder Horse in place while she is drilling in rough weather (seas).
Thanks.
On platforms this big and deep, the "line" can be pipe up to 30" in diameter.
How long can these companies hold the leases without actually developing?