To: tubebender
There was a ready-mix concrete truck on the bridge deck at the South end.
Along with what appeared to be a pump, and several motor-buggies.
There was a full scale batching operation being performed on that bridge deck.
110 posted on
08/09/2007 8:14:33 PM PDT by
concretebob
(I'm NOT pro-war, I'm ANTI - TERRORIST)
To: concretebob
Were they putting down a concrete overlay or had they ground the deck down prior?
112 posted on
08/09/2007 8:40:52 PM PDT by
tubebender
(My first great grandson is a Miniature Schnauzer...)
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson