Structural safety engineer on Channel 5. Surface reconstruction was simply a deck overlay. IT does appear that there may have been a significant number of construction workers on the bridge. Says something had to be weakened in the superstructure - the beams supporting the bridge.

There was some minor cracking in the structural steel in an inspection in 2006!!!!!

316 posted on 08/01/2007 5:13:19 PM PDT by Solson (magnae clunes mihi placent, nec possum de hac re mentiri.)
[ Post Reply | Private Reply | To 294 | View Replies ]


To: Solson

The connection points to the pylons look awfully small. (See the lower right corner.)

531 posted on 08/01/2007 5:34:19 PM PDT by Gideon7
[ Post Reply | Private Reply | To 316 | View Replies ]

To: Solson

If 2 lanes were light except for 18 construction workers & their stuff and the thru lanes were bumper to bumper would that not be like a ship that had too many passengers on one side? Could it have been too much load on the open lanes like a tipping over event?


2,603 posted on 08/04/2007 11:54:27 AM PDT by floriduh voter (Terri's List - 8mmmauser & DUNCAN HUNTER FOR PRESIDENT)
[ Post Reply | Private Reply | To 316 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson