Free Republic
Browse · Search
News/Activism
Topics · Post Article

To: kingu

Press conference...

A line was mistakenly cut at a distribution station, attached to another line that wasn't expecting that much power, which then tripped control sequences all the way back to power generators. Power should be coming up by about 4pm everywhere, though some areas might have rolling blackouts as they balance the energy load.


253 posted on 09/12/2005 2:31:41 PM PDT by kingu (Draft Fmr Senator Fred Thompson for '08.)
[ Post Reply | Private Reply | To 251 | View Replies ]


To: kingu

I guess the guy didn't fry himself. (bad joke) maybe a terrorist.. testing, testing 1 . 2. 3


265 posted on 09/12/2005 2:49:13 PM PDT by newfrpr04
[ Post Reply | Private Reply | To 253 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson