The WECC Daily Report shows the following, so it could easily have been a maintenance worker who messed up.
The CMRC reported the following outages for today:
From 0000-2400 the COI may be limited to 4,500 MW north to south due to Northern CA Hydro and Midpoint-Summer Lake line loading. From 0600-0800 the COI is further limited to 2,400 MW north to south and 2,450 MW south to north due to Grizzly-Malin #2 500-kV line outage.
From 0800-2400 it is further limited to 1,600 MW north to south and 2,450 MW south to north due to the Grizzly-Malin #2, Buckley-Marion #1, Ashe-Marion #2, Schultz- Raver #1 and Schultz-Echo Lake #1 500-kV line outages.
From 0000-2400 the PDCI may be limited to 2,084 MW south to north due to CISO Operating Procedure T-116Q.
From 0600-2400 the PDCI is further limited to 2,805 MW north to south and 1,904 MW south to north due to the Grizzly-Malin #2, Buckley-Marion #1, Ashe-Marion #2, Schultz-Raver #1 and Schultz-Echo Lake #1 500-kV line outages.
From 0000-2400 the Path 44 is limited to 1,650 MW north to south due to the TL 23002/23010 contingency which is the availability to drop load limit south of SONGS.
From 0000-2400 the West of River/Path 46 is limited to 10,088 MW east to west due to Eldorado-Lugo 500-kV series capacitor segment #3 at Lugo by-passed. From 0000-1600 it is further limited to 10,058 MW east to west due to the McCullough-Victorville capacitor outage.
From 0700-1500 it is further limited to 8,967 MW east to west due to McCullough- Victorville #1 500-kV line outage.
Other Comments: None Yesterday/Weekend/Holiday Notable Events: None