I think that the AC grids should be broken down into smaller regional units. These should be connected by a new network of DC transmission lines for transfer of power between the regional grids. Tarrifs should reflect costs. All nuclear plants should be nationalized and operated by a single operator so that training, supervision, and maintenance could be controlled at a high, uniform standard. Nuclear plant construction should be restarted, using newer and safer designs.
10 posted on 08/17/2003 1:11:11 PM PDT by Lessismore
[ Post Reply | Private Reply | To 7 | View Replies ]


To: Lessismore
All nuclear plants should be nationalized...

So you believe in theft and slavery? What the h*ll are you doing on this forum?

12 posted on 08/17/2003 1:27:53 PM PDT by snopercod
[ Post Reply | Private Reply | To 10 | View Replies ]

To: Lessismore
What is the reasoning for a new network of "DC" transmission lines? Isn't there a much greater loss of power over transmission lines using DC versus AC? That is the reason transmission lines use AC instead of DC in what I have read, is that correct or not?

Is there some new technology that gives DC the advantage over AC in transmission lines now? I would very much like to hear your reasoning for going DC instead of AC. Any reasons for going to DC transmission lines over AC would be highly appreciated, TIA.
14 posted on 08/17/2003 2:04:44 PM PDT by herkbird
[ Post Reply | Private Reply | To 10 | View Replies ]