The engineer did a download of the existing program to solve his problem to clear the locked up logic.
There were large parts of very large machines as far away as the parking lot.
"Button pushers". Management loves them because they never know enough about what they do to explain bad news.
Until......
Lose power in port during maintenance.
Realign electric plant to get the lights on.
Get underway in a lineup that won’t support underway load.
Leave pier and start turning on more stuff, especially steering.
Overload diesel generator.
Lose power
Shut breaker without knowing why it tripped or dumping load.
Trip breaker again.
All the while propulsion diesel is dead.
Hit bridge.