They absolutely should. Generators have a “break then make” switch as a necessary safety feature.
Backfeeding into the system during outages could get a lineman killed.
They are all supposed to “test before touch”, but remembering safety protocols during your 7th 16 hour shift is iffy.
I understand the backfeed issue, so I guess they simply design for cost and cutoff the solar if utility power cuts out.