Free Republic
Browse · Search
News/Activism
Topics · Post Article

To: gleeaikin

I said that, when they were building it, it was only 8 months from completion. If Joe Biden had left it alone, it would have been built by September 2021, because they had the materials, they had the equipment, and they had the personnel. All that is now gone.

If Joe Biden allowed to be built, from where they left off, it would take the approximate times I listed to get the materials, equipment and personnel. You can’t just start these in a couple of weeks, because it is continent wide strategizing session that get put together by many industries, because they are that huge of projects. The fact that you don’t realize that means you have no understandings of the issues at why, even if Joe Biden wrote a black cheque to get’er done, why the industry would not jump at the opportunity.

THe Ukraine had little discernible effect. The price was rising from the time that Joe Biden got elected, because the industry had anticipated his hostility to the oil industry and Biden’s actios proved them right when he killed ANWAR, and the Gulf leases retroactively.

It takes the same time to set up a refinery in Alberta as it would a pipeline, but it will not be done because we have an a-hole Prime Minister that wants to see Albertans starve to death because it puts a smil on his face. Without no ability to approve a pipeline, there can be ability to build a refinery. Sending the oil onto the world make the refinery feasible. Building the refinery just for Alberta keeps in unfeasible.

Again, if green energy worked, it should have been a slight inconvenience for Germany to be cut off of Russian oil. The proof is the pudding. Renewables don’t work.

Gasoline and Diesel are the two most dense unit/work energy souce in the world. Everything else pales in comparison.

Gasoline is about a trillion times more energy dense than sunlight and it always works.

Source Joules per cubic meter
Solar 0.0000015
Geothermal 0.05
Wind at 10 mph (5m/s) 7
Tidal water 0.5–50
Human 1,000
Oil 45,000,000,000
Gasoline 10,000,000,000
Automobile occupied (5800 lbs) 40,000,000
Automobile unoccupied (5000 lbs) 40,000,000
Natural gas 40,000,000
Fat (food) 30,000,000

Page 441
https://drexel.edu/~/media/Files/greatworks/pdf_sum10/WK8_Layton_EnergyDensities.ash

Probably the best combination, if you were choosing effectiveness and efficiency is nuclear power for homes and buildings but a liquid source that has carbon for vehicles.

Renewables sound great, in theory, but we still have to live in a world that is governed by physics.


48 posted on 07/17/2022 12:44:28 AM PDT by Jonty30 (Are vegetarian real vegetarian burgers or just fake meat?)
[ Post Reply | Private Reply | To 46 | View Replies ]


To: Jonty30; PIF; familyop; MalPearce; Kevmo; All

Keystone was a multi segment pipeline project much of which had already been built. When Biden shut down the XL portion, only about 8% had been built. See link below for more details.

https://www.reuters.com/article/factcheck-keystonepipelinexl-builtandpai/fact-check-though-keystone-xl-pipeline-had-secured-most-of-its-funding-it-was-only-8-constructed-idUSL1N2LA2SQ


51 posted on 07/17/2022 3:23:34 AM PDT by gleeaikin (Question authority)
[ Post Reply | Private Reply | To 48 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson