Here are the main questions that need to be asked. How many of the ERCOT board members have ever been directly responsible for the operation of an electric generating station or an electric transmission system. How many of them have held a position that required that they decide when, where, and what fuel to use for the next electric power generating plant on the their system or when and where to build the next electric power transmission line? If the ERCOT board of directors consists of university eggheads and environmental so called experts, then this could be the root cause of the problem.
Yeah - sorta like the “hunter biden” job deals
Experienced academy graduate marine engineers. They can fix just about anything.
That’s all on Abbott!