Free Republic
Browse · Search
News/Activism
Topics · Post Article

Skip to comments.

Seattle tunnel construction avoided costly mistakes of Boston's Big Dig
King 5 News ^ | January 17, 2019 | Amanda Grace

Posted on 02/24/2019 1:15:04 PM PST by Tolerance Sucks Rocks

click here to read article


Navigation: use the links below to view more comments.
first previous 1-2021-4041-46 last
To: IndispensableDestiny
The hills in and around Boston were pulled down to create the fill. Tough work in the 19th century.

Same thing in Seattle. The tunnel and the viaduct are in fill.

41 posted on 02/25/2019 11:39:53 AM PST by gogeo (Liberal politics and mental instability; coincidence, correlation, or causation?)
[ Post Reply | Private Reply | To 19 | View Replies]

To: gogeo
They used one of those large round visitor ships from the V series to suck all the water out of the harbor so they could then cut and cover.


42 posted on 02/25/2019 12:53:27 PM PST by Tolerance Sucks Rocks (Modern feminism: ALL MEN BAD!!!)
[ Post Reply | Private Reply | To 39 | View Replies]

To: jim_trent; gogeo

LOL. I had my doubts on the tunnel due to the variable geology. Some of the tunnel route is the hydraulic fill of loose sand. Other portions are a wide variety of overburden dumped by the glaciers (gravel, clay, silt, etc.) I think it was something like ten different types of materials they had to dig through. They did have some issues with subsidence due to when it was stuck.


43 posted on 02/25/2019 1:37:07 PM PST by 21twelve (!)
[ Post Reply | Private Reply | To 37 | View Replies]

To: rockrr
The viaduct was 8-lanes.

The viaduct was SIX narrow lanes....and it had downtown exits, unlike the new tunnel.
44 posted on 02/25/2019 1:48:26 PM PST by LanaTurnerOverdrive ("I've done things in my life I'm not proud of. And the things I am proud of are disgusting.")
[ Post Reply | Private Reply | To 2 | View Replies]

To: LanaTurnerOverdrive

Thanks for the correction. It’s been years since I have ventured into the valley of the shadow...


45 posted on 02/25/2019 2:52:54 PM PST by rockrr ( Everything is different now...)
[ Post Reply | Private Reply | To 44 | View Replies]

To: rockrr

Now they are removing buses from the tunnel because they slow down the trains.


46 posted on 02/28/2019 7:16:45 AM PST by moehoward
[ Post Reply | Private Reply | To 12 | View Replies]


Navigation: use the links below to view more comments.
first previous 1-2021-4041-46 last

Disclaimer: Opinions posted on Free Republic are those of the individual posters and do not necessarily represent the opinion of Free Republic or its management. All materials posted herein are protected by copyright law and the exemption for fair use of copyrighted works.

Free Republic
Browse · Search
News/Activism
Topics · Post Article

FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson