Posted on 09/25/2018 7:38:04 PM PDT by artichokegrower
The crack discovered Tuesday in a steel beam that supports the roof garden of the new, $2.2 billion Transbay Transit Center forcing the terminals abrupt closure just as rush-hour was getting going is the latest headache for the 2 1/2 block long transit hub.
(Excerpt) Read more at sfgate.com ...
Crack is Whack!
Designed by the same folks that designed the FIU bridge?
Some enterprising soul needs to make a postcard of that saying and sell it in SanFran!!!
And the funny thing is, they think they're really smart and you're really stupid.
You have to be Wack to get in Dawns crack...
“wonder how much of that money actually went to the project?”
How much went in DiFi’s hobbies pocket.
They're in luck, there are thousands of crack experts in San Francisco!
From the story:
6:10 p.m.
A San Francisco transit official says workers discovered a crack in a steel beam at the city’s celebrated new transit terminal as they installed ceiling panels.
After further inspections, Transbay Joints Power Authority Executive Director Mark Zabaneh says officials decided Tuesday to immediately close the $2.2 billion center.
Zabaneh says the crack is near a weld on a stress-bearing beam. He said he did not know how long the crack was.
Zabaneh says inspectors will be working at the building throughout the night to assess whether it is safe for people to return. He does not believe the problem is related to a sinking condominium building next door.
The center opened in August after nearly a decade of construction. Zabaneh said American steel was used for its construction.
“He does not believe the problem is related to a sinking condominium building next door.”
That made me REALLY laugh out loud.
.
they typically will start out with US steel as project specs require, then start slipping in the chinese junk with fake mill certs in the shipping documents, ( don't ask me how I know, I have busted them many times and got re-assigned each time )
built with Chinese steel thanks Diane Feinstein and Chinese laborers
I read the steel is USA made, who knows
How come our idiotic “elites” can’t even seem to competently manage the construction projects that were easily built int the 1950’s and even before ?
When the bay Bridge collapses the golden Gate will still stand
When the Millenium tower craters the Trans America Building will still be there
The old stuff was built with mild steel, reinforced concrete, graph paper, slide rules. The new stuff they have all the advanced software and materials, and they can’t even build pedestrian bridges ?
Via Canada. Guaranteed.
Because the people who built those things were honest and had character.
They're held up by more than steel.
It looks like they were trying to make art, rather than a building that would stand up for a long time.
Because our neo experts are so much smarter than their forbears that they dont need so much engineering margin. Saves lots of money for graft anc corruption too.
Chinese foundry products relabeled nothing new.
Story reads more like a shrinkage crack. Oversize weld passes? Insufficient preheat?
Disclaimer: Opinions posted on Free Republic are those of the individual posters and do not necessarily represent the opinion of Free Republic or its management. All materials posted herein are protected by copyright law and the exemption for fair use of copyrighted works.