“The Owner chose the site.”

You’re saying the structure is within ordinary tolerances, and no other tolerances were specified in the contract, so the designer is off the hook?

Hope the next launcher (mentioned in the article) will be better designed.

Wonder why they didn’t build the 1st launcher to accommodate the larger version of the rocket’s second stage?


54 posted on 02/21/2018 12:41:35 PM PST by cymbeline
[ Post Reply | Private Reply | To 31 | View Replies ]


To: cymbeline

I am not saying that specifically. I am saying that the designer, and then the contractor, are stuck with time, location, and cost considerations that the Owners is able to give them for his own reasons.

See my reply to another at #59.

We often need a lot of forensic investigations and sometimes even courts to settle issues like this as far as “responsibility.”

When the tower in Pisa began to lean, I am sure that it was said, well this will soon be on the ground and forgotten. Sometimes first impressions are wrong.


62 posted on 02/21/2018 2:13:34 PM PST by KC Burke (If all the world is a stage, I would like to request my lighting be adjusted.)
[ Post Reply | Private Reply | To 54 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson