The existing bridge that stood for decades was probably engineered using a slide rule and pencil and paper. The engineered drawings are probably still on file somewhere...How many times does the same thing at the same location have to be engineered? And for how many billion$?
If it’s anything like the new Bay Bridge it won’t be the design that’s a cost issue, it’ll be the crappy materials QA/QC.