Any DOD/E plant I worked in had stricter protocols than NRC requirements.
Does that include INEL that had the spent fuel rods lying at the bottom of the fuel pools after the hangers rotted apart or Hanford that had the tank filled with liquid waste that was generating heat or Fernald that had waste stored from WWII?