>>reinforcing a vulnerability of the headworks of the main spillway, as assessed by a structural engineers report.<<
Greetings, was this “structural engineer’s report” done after the assessment of the erosion from observation of the results of the first ES overtopping?
Actually, I believe it was done from about 1500 miles away.
(by an engineer intimately familiar with the short-comings of the original design)