To: EarthResearcher333; All

EarthResearcher333, take care of your ticker. I have three stints but am other wise healthy.

I have lived near Seattle for over 40 years. My wife and 3 neighbors are conservative. That is how I feel talking with the rest of the population.

Jaun’s latest, 6 April Update The ‘New’ Spillway Design Revealed!

https://www.youtube.com/watch?v=QAY-4-NeB18


2,983 posted on 04/07/2017 4:40:49 PM PDT by Bobsvainbabblings
[ Post Reply | Private Reply | To 2975 | View Replies ]


To: All

sounds like they plan to increase flows from 9800 to max 13,000 here soon(why did they decrease in the first place?)

Oroville >> Flows in the Feather River were to be increased Friday evening by the state Department of Water Resources.

DWR said that at 7 p.m., the flows in the stretch of the river past downtown Oroville would increase from 1,600 cubic-feet per second to 5,000 cfs, and warned the water would be deeper and swifter.

An additional 8,750 cfs were to be released into the river at the Thermalito Afterbay outlet downstream, for a total river flow of 13,750 cfs, up from 10,350 cfs.

The extra water will be coming through the Hyatt Powerhouse underneath Oroville Dam, which will be increasing releases from 9,800 cfs to 13,000 cfs.

No water is being released through the damaged main spillway.

Inflow into the lake has risen with the current storm, and is in the 35,000-40,000 cfs range. That’s about double the inflow on Thursday.

At 4 p.m. Friday the lake surface was at 848.6 feet above sea level, an increase of more than 3 feet in 24 hours.

http://www.orovillemr.com/general-news/20170407/feather-river-flows-increase-friday-night?utm_source=dlvr.it&utm_medium=twitter


2,984 posted on 04/07/2017 5:28:50 PM PDT by janetjanet998
[ Post Reply | Private Reply | To 2983 | View Replies ]

To: Bobsvainbabblings; All

Thanks for posting the video update. I enjoy them.

Not sure that anything but a complete rebuild will be sufficient here, but if they do it right, it is a tried-and-true design, isn’t it?

According to the video, they will repair/rebuild the top portion first and will for certain have that done by November 1. The bottom portion will maybe be done by then also, but maybe not.

He had no information on whether or not they would rebuild the spillway gate portion. I suspect that it will get significant maintenance anyway.


2,985 posted on 04/07/2017 6:21:45 PM PDT by meyer (The Constitution says what it says, and it doesn't say what it doesn't say.)
[ Post Reply | Private Reply | To 2983 | View Replies ]