I think the caption is wrong and the 1st pic on the 17th is 50,000

you can tell by the spray (more of it) plus on the 17th total out flow was 50,000 in the afternoon according to the data and they turned the power plant off at first until that evening......not 100% sure though

in any case, assuming a steady 40000 out of the main spillway the outflow from the power plant has been slowly decreasing over time and is now around 5000 cfs ....a few days ago it was 6800...

I suspect more debris is being washed in to the pool and they have to cut back to prevent the water backing up


2,617 posted on 03/23/2017 7:28:14 PM PDT by janetjanet998
[ Post Reply | Private Reply | To 2614 | View Replies ]


To: janetjanet998

Apparently the operating plan is to use the main spillway to drop the res level to just above the spillway use min level.

Then shut off flow and go excavate the river below to allow the powerplant to operate. Repeat as needed.


2,621 posted on 03/23/2017 9:39:36 PM PDT by Paladin2 (No spellcheck. It's too much work to undo the auto wrong word substitution on mobile devices.)
[ Post Reply | Private Reply | To 2617 | View Replies ]

To: janetjanet998
I suspect more debris is being washed in to the pool and they have to cut back to prevent the water backing up.

Quite possible, perhaps even likely, though there is a LOT less debris present this time around since the loose material has already been eroded away.

Another possibility in relation to the plant is the re-routing of the power lines. We only get to see the pictures of the linemen working on assembling the "temporary" structures, but there are also crews working in the power station at the base of the dam. It is quite possible that one or two of the original 3 lines have been taken out of service for a couple of days to allow them to re-terminate the new lines. They cannot do that work while energized. That would limit the amount of power that the plant could produce due to the lack of full line capacity.

It would make sense to coordinate that work with the operation of the spillway as much as possible.

2,624 posted on 03/24/2017 1:18:18 AM PDT by meyer (The Constitution says what it says, and it doesn't say what it doesn't say.)
[ Post Reply | Private Reply | To 2617 | View Replies ]

Free Republic
Browse · Search
News/Activism
Topics · Post Article


FreeRepublic, LLC, PO BOX 9771, FRESNO, CA 93794
FreeRepublic.com is powered by software copyright 2000-2008 John Robinson