Scanner: Crews ordered off the spill way as they will begin cutting wires in 40 minutes.
??
Checking in.
Thanks so much, maggie, for updates.
The erosion on the left side of the spillway was pretty close to the power lines... are they worried that the ground is not stable there? Bad news if so.